← 2025年の目次へ戻る

WEP012

ポスターセッション① 8月6日 7-1F-A 12:40-14:40

小型ミューオンリニアックにJ-PARC加速器制御システムを導入する挑戦
Challenges in Applying the J-PARC Control System to a Small Muon Linac

○楊 敏, 上窪田 紀彦, 山田 秀衛, 木村 真人, 大谷 将士(高エネルギー加速器研究機構)
○Min Yang, Norihiko Kamikubota, Shuei Yamada, Masato Kimura, Otani Masashi(KEK)

A compact muon linear accelerator (linac) is under construction at J-PARC as part of the muon g-2/EDM experiment. Unlike large-scale accelerators, this small-scale system is managed by a compact team with limited resources. To facilitate easy and fast development of its control system, we adopted the same control system framework used in the J-PARC accelerator. Development of the control system began in 2024. The implementation of the Ultra-Slow Muon (USM) section -- the muon source part of the accelerator -- was mostly completed by April 2025. Core functionalities of the control system are scheduled for verification during May and June, with beam commissioning of the USM section planned for December 2025. This paper describes the current development status of the control system for the muon linac and discusses the advantages and challenges of adapting a large-facility control system framework to a small-scale project.

PDFを開く