FRP028
ポスターセッション③ 8月8日 7-1F-B 10:00-12:00
J-PARC 3 GeVシンクロトロン入射ダンプの中性子によるサンプル放射化評価 (2)
VALUATION OF THE SAMPLE ACTIVATION AT THE INJECTION DUMP OF J-PARC 3 GeV RAPID CYCLING SYNCHROTRON (2)
○山本 風海1, 中野 秀仁1, 松本 哲郎2(1日本原子力研究開発機構 J-PARCセンター, 2産業技術総合研究所)
○Kazami Yamamoto1, Hideto Nakano1, Tetsuro Matsumoto2(1J-PARC Center, JAEA, 2AIST)
To accumulate a high-intensity beam in the Rapid Cycling Synchrotoron(RCS), the H- beams from the linac converted into protons and injected into the RCS. In this process, a certain amount of the beam is not converted, and it leads to the injection dump. Since the secondary particles are constantly produced inside the dump due to this waste beam, we have studied if those secondary particles can be used as an irradiation test. In this report, we compare the residual nuclides obtained from the calculations using PHITS/DCHAIN codes and measurements using a germanium-semiconductor detector after activating a bismuth-209 sample. We also developing the sample insertion system for irradiation test.